Back to Academy

Academy · 04 / 02 · Regulation

Mexico: generation, storage and interconnection

Navigate the 2025-2026 electricity framework through SENER, CNE and CENACE.

Live data · verify before use

Level
Decision
Reading time
20 min
Reviewed
2026-08-24
Next review
2026-09-24
Jurisdiction
Mexico

What you will learn

  1. 01Replace the former LIE-CRE map with the current LSE-CNE framework.
  2. 02Classify generation, self-consumption and storage configurations.
  3. 03Keep energy, social and environmental files separate.

Core concepts

LSESENER · CNE · CENACEPLADESESIASICSAEE

01

The institutional map changed

The 2025 Electricity Sector Law repealed the former LIE and CNE replaced CRE. SENER leads binding planning, CNE permits and regulates, and CENACE studies connection, operates the system and administers the market. Legacy instruments survive only to the extent allowed by transitional rules and must be checked individually.

02

Configuration determines the route

Distributed generation is below 0.7 MW; permits generally begin at 0.7 MW, but that threshold does not waive environmental, social, land, municipal or safety requirements. Storage rules distinguish systems associated with a plant, load, self-consumption, network or standalone. MISE is a SENER social filing; MIA is a separate SEMARNAT environmental filing.

Decision notes

  • 01The 54% rule is not a universal 46% private cap per project.
  • 02Verify CENACE manuals and contracts by version; repositories mix vintages.

Primary sources

Open the official source and confirm its current edition, jurisdiction and adoption before applying it.

  1. 01DOF · Ley del Sector Eléctrico (18-03-2025)
  2. 02DOF · Reglamento de la LSE (03-10-2025)
  3. 03DOF · Integración de SAEE (16-04-2026)
  4. 04CENACE · Conexión e interconexión